Step 1 – Design Stage (Approx. 2 Weeks)

Design your new home like a pro

Choose your favourite layout and home size
Add personality with exterior finishes and extras
Visit the JanVeek office to experience concrete living firsthand

Step 1 – Design Stage (Approx. 2 Weeks)

Design your new home like a pro
Choose your favourite layout and home size
Add personality with exterior finishes and extras
Visit the JanVeek office to experience concrete living firsthand

Step 2 – Site Assessment & Documentation (Approx. 4 Weeks)

JanVeek handles all the technical stuff

The build team visits the site to ensure appropriate conditions and acceptable access for concrete building
Your site is assessed for construction viability
Once  the site assessment is completed a site survey is completed by a 3rd party and required site utilities are coordinated with the local utilities
JanVeek’s architectural and engineering paperwork is submitted to the building department and relevant conservation authorities on your behalf
JanVeek obtains the necessary building permits

Step 2 – Site Assessment & Documentation (Approx. 4 Weeks)

JanVeek handles all the technical stuff

The build team visits the site to ensure appropriate conditions and acceptable access for concrete building
Your site is assessed for construction viability
Once the site assessment is completed a site survey is completed by a 3rd party and required site utilities are coordinated with the local utilities
JanVeek’s architectural and engineering paperwork is submitted to the building department and relevant conservation authorities on your behalf
JanVeek obtains the necessary building permits

Step 3 – Exterior Construction (Approx. 8 Weeks)

Don’t worry, we’ve been doing this since 2002

Once the approvals have been granted by the local building office, the fun begins

First, we cast the slab and then we start assembling your tilt-up concrete home

Simultaneously, your tilt-up concrete panels are constructed off-site at our Woodstock facility and then transported to your location where they’re assembled by our highly skilled construction team

The panels take a couple of weeks to construct, but the onsite assembly only takes a day to assemble. Here’s how that’s done:

Step 3 – Exterior Construction (Approx. 8 Weeks)

Don’t worry, we’ve been doing this since 2002

Once the approvals have been granted by the local building office, the fun begins

First, we cast the slab and then we start assembling your tilt-up concrete home

Simultaneously, your tilt-up concrete panels are constructed off-site at our Woodstock facility and then transported to your location where they’re assembled by our highly skilled construction team

The panels take a couple of weeks to construct, but the onsite assembly only takes a day to assemble. Here’s how that’s done:

Step 4 – Interior Construction (Approx. 2 Weeks)

Your vision comes to life

The walls have been assembled
Now, it’s time to turn these concrete panels into a home
The final phase involves the installation of the following:

• Doors
• Windows
• HVAC
• Plumbing

• Electrical
• Bathrooms
• Kitchens
• Floors

Step 4 – Interior Construction (Approx. 2 Weeks)

Your vision comes to life

The walls have been assembled
Now, it’s time to turn these concrete panels into a home
The final phase involves the installation of the following:
• Doors
• Windows
• HVAC
• Plumbing & Electrical
• Bathrooms
• Kitchens
• Floors