Your Tilt-Up Concrete Home in 4 Steps
Pick the layout you like
Choose your features
Let JanVeek handle the rest
Cross the threshold in 3-4 months
Homebuying made simple
Your Tilt-Up Concrete Home in 4 Steps
Pick the layout you like
Choose your features
Let JanVeek handle the rest
Cross the threshold in 3-4 months
Homebuying made simple
Step 1 – Design Stage (Approx. 2 Weeks)
Design your new home like a pro
Choose your favourite layout and home size
Add personality with exterior finishes and extras
Visit the JanVeek office to experience concrete living firsthand
Step 1 – Design Stage (Approx. 2 Weeks)
Design your new home like a pro
Choose your favourite layout and home size
Add personality with exterior finishes and extras
Visit the JanVeek office to experience concrete living firsthand




Step 2 – Site Assessment & Documentation (Approx. 4 Weeks)
JanVeek handles all the technical stuff
The build team visits the site to ensure appropriate conditions and acceptable access for concrete building
Your site is assessed for construction viability
Once the site assessment is completed a site survey is completed by a 3rd party and required site utilities are coordinated with the local utilities
JanVeek’s architectural and engineering paperwork is submitted to the building department and relevant conservation authorities on your behalf
JanVeek obtains the necessary building permits
Step 2 – Site Assessment & Documentation (Approx. 4 Weeks)
JanVeek handles all the technical stuff
The build team visits the site to ensure appropriate conditions and acceptable access for concrete building
Your site is assessed for construction viability
Once the site assessment is completed a site survey is completed by a 3rd party and required site utilities are coordinated with the local utilities
JanVeek’s architectural and engineering paperwork is submitted to the building department and relevant conservation authorities on your behalf
JanVeek obtains the necessary building permits




Step 3 – Exterior Construction (Approx. 8 Weeks)
Don’t worry, we’ve been doing this since 2002
Once the approvals have been granted by the local building office, the fun begins
First, we cast the slab and then we start assembling your tilt-up concrete home
Simultaneously, your tilt-up concrete panels are constructed off-site at our Woodstock facility and then transported to your location where they’re assembled by our highly skilled construction team
The panels take a couple of weeks to construct, but the onsite assembly only takes a day to assemble. Here’s how that’s done:
Step 3 – Exterior Construction (Approx. 8 Weeks)
Don’t worry, we’ve been doing this since 2002
Once the approvals have been granted by the local building office, the fun begins
First, we cast the slab and then we start assembling your tilt-up concrete home
Simultaneously, your tilt-up concrete panels are constructed off-site at our Woodstock facility and then transported to your location where they’re assembled by our highly skilled construction team
The panels take a couple of weeks to construct, but the onsite assembly only takes a day to assemble. Here’s how that’s done:












Step 4 – Interior Construction (Approx. 2 Weeks)
Your vision comes to life
The walls have been assembled
Now, it’s time to turn these concrete panels into a home
The final phase involves the installation of the following:
• Doors
• Windows
• HVAC
• Plumbing
• Electrical
• Bathrooms
• Kitchens
• Floors
Step 4 – Interior Construction (Approx. 2 Weeks)
Your vision comes to life
The walls have been assembled
Now, it’s time to turn these concrete panels into a home
The final phase involves the installation of the following:
• Doors
• Windows
• HVAC
• Plumbing & Electrical
• Bathrooms
• Kitchens
• Floors